News
Helicopter lifts solar cells in place at Ultuna
Published: 13 July 2018

On 3 and 4 August, Akademiska hus will mount solar cells on buildings at Ultuna. The solar cells will be lifted up on the roofs with a helicopter. While the lift is done, roads and places will temporarily be closed off so nobody can get under the load.
The solar cells are installed at VHC on August 3 and at Ull's house, Undervisningshuset and MVM on August 4. Information signs will be set up.